Livestock

Hadejia Jama’are Embarks on Maintenance, Canal De-silting, Flood Control

The Hadejia Jama’are River Basin Development Authority has embarked on measures for flood control and maintenance activities at one of its dams.

The Managing Director of the Authority, Alhaji Rabiu Suleiman Bichi, FNIQS, who visited the Kaban Irrigation Scheme in Jigawa, said he was there to supervise ongoing typha grass clearance, canal de-silting, and other flood and erosion control measures vital to the sustainability of the irrigation infrastructure.

He directed the immediate assessment and repair of the equipment to ensure full functionality and efficiency, thereby accelerating the progress of the ongoing work.

Additionally, the Managing Director inspected other critical areas, including the HVIS office and the Hadejia Barrage, to evaluate the progress of flood control measures and infrastructural integrity.

The visit, according to the spokesperson of Hadejia Jama’are, Salisu B. Hamzat, underscores the organization’s commitment to enhancing irrigation efficiency, flood management, and erosion control in Jigawa State.

He reaffirmed the leadership’s dedication to implementing sustainable solutions that will benefit local communities and support agricultural productivity in the region.

Those who accompanied the Managing Director included the Honorable Commissioner, Ministry of Environment, Jigawa State, Dr. Nura Mohd; the Director of the Construction Unit, Engr. Umar Ibrahim Langel; and the Deputy Director, Civil, Engr. Sabiu Dan Malan.

Others were the Assistant Director, Mechanical, Engr. Ibrahim Hamza Ahmed; the Project Manager, Hadejia Valley Irrigation Scheme (HVIS), Engr. Muhammad Abdullahi; and the Special Adviser to the Jigawa State Governor on Flood Control, Malam Hamza Hadejia.

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button