Minister: Goronyo Dam to Create 85,000 Jobs for Farmers

By Halimatu Ginsau
The Minister of Water Resources and Sanitation, Professor Joseph Utsev, has addressed residents of Goronyo and surrounding communities, affirming the safety of Goronyo Dam and addressing concerns about potential flood risks.
According to Utsev, the dam has the capacity to create approximately 85,000 jobs for local farming families.
Prof. Utsev, represented by Mrs. Oluwatosin Abiola, the Deputy Director of Dams in the ministry, made this statement on Tuesday during a visit to Goronyo Dam in Sokoto State.
The inspection was part of the work of the Inter-ministerial Technical Committee on the Evaluation of Dams in Nigeria, focused on assessing dam safety and exploring possible economic uses.
“Goronyo Dam remains safe, with its structure in proper condition,” Utsev said, explaining that the visit was part of efforts to evaluate the status of aging dams across the country.
“Many dams in Nigeria require maintenance and upgrades,” he added, stressing the importance of such evaluations to prevent future challenges.
The dam, with a capacity of 943 million cubic meters, spans a primary embankment of 5.2 kilometers, a secondary embankment of 1.3 kilometers, and a 15-kilometer emergency spillway, supported by a 200-kilometer natural reservoir.
This infrastructure supports about 5,000 hectares of irrigation land, providing jobs to nearly 80,000 people through farming and fishing activities, while also supplying water for local treatment facilities.
Utsev noted that the dam has potential for hydroelectric generation, which the committee is exploring.
Findings from the technical committee’s evaluations will be submitted for further action to improve the dam’s economic output.
The inspection of Goronyo Dam is part of a nationwide assessment of Nigeria’s dam infrastructure, aimed at guiding policies related to flood control, water management, and community impact.




